High-Rise

Shenzhen Qianhai Financial Center

Guangdong, China · 220,000 m² · Completed 2025

Home/Projects/Shenzhen Qianhai Financial Center
220,000 m²
Built Area
2025
Completion
218 m
Scale
5 days
Floor Cycle
Shenzhen Qianhai Financial Center

The Challenge

A 218-metre tower with a continuously changing floor plate and a central core that had to climb ahead of the slab. Wind loading at height ruled out conventional loose-panel handling.

Our Approach

What We Supplied

A hybrid package: aluminium formwork for the typical floors above level 8, steel formwork for the core walls, and ringlock scaffolding for the perimeter access. Panels were grouped into crane-liftable table units to minimise loose components at height.

Outcome

Results on Site

  • 5-day cycle held for 40 consecutive typical floors
  • Core wall verticality kept within 8 mm over full height
  • Crane movements reduced roughly 35% versus loose-panel handling
  • Surface quality accepted first time on every pour
Shenzhen Qianhai Financial Center — system in use
Project Data

Specification Summary

ProjectShenzhen Qianhai Financial Center
LocationGuangdong, China
CategoryHigh-Rise
Built Area220,000 m²
Scale48 floors · 218 m
Achieved Cycle5 days / floor
Completion2025

Planning a Similar Project?

Send us your drawings and we will show you exactly how our system would fit your build.

Shaanxi Hangtou Anping New Materials Technology Co., Ltd. — a one-stop manufacturer of aluminium formwork, steel formwork, scaffolding and support systems for contractors in 30+ markets.

Language

Contact

info@aluminumformpro.com

+86 29 8888 6666

Shaanxi, China

Privacy Policy Terms & Conditions
© 2026 AP Building Materials. All rights reserved.
Chat with us on WhatsApp