Xi’an High-Tech Zone Talent Apartments
Shaanxi, China · 180,000 m² · Completed 2025

The Challenge
Six residential towers had to be topped out within a single construction season, while the developer demanded an exposed fair-faced concrete finish that would eliminate internal plastering entirely.
What We Supplied
We supplied a full 6061-T6 aluminium formwork package with BIM-verified panel layouts for every floor plate. Wall, slab, beam and stair components were pre-assembled and numbered in our factory, so the site crew only had to pin them together. Two of our engineers stayed on site for the first three cycles to train the labour team.
Results on Site
- 4-day floor cycle achieved from cycle 3 onward
- Plastering removed from the programme — 22 days saved per tower
- Panel reuse reached 168 cycles with no measurable deflection
- Zero safety incidents across the 14-month programme

Specification Summary
| Project | Xi’an High-Tech Zone Talent Apartments |
|---|---|
| Location | Shaanxi, China |
| Category | Residential |
| Built Area | 180,000 m² |
| Scale | 6 towers · 33 floors |
| Achieved Cycle | 4 days / floor |
| Completion | 2025 |
Planning a Similar Project?
Send us your drawings and we will show you exactly how our system would fit your build.
Shaanxi Hangtou Anping New Materials Technology Co., Ltd. — a one-stop manufacturer of aluminium formwork, steel formwork, scaffolding and support systems for contractors in 30+ markets.
Products
Aluminum FormworkSteel FormworkPlastic FormworkRinglock ScaffoldingSteel SupportShear Wall ReinforcementFormwork AccessoriesLanguage
Contact
info@aluminumformpro.com
+86 29 8888 6666
Shaanxi, China
Privacy Policy Terms & Conditions